If you're planning to build a pole barn in Dickson County—whether in Dickson, White Bluff, Burns, or Charlotte—one of the first questions you'll ask is whether you need a building permit. The honest answer is that it depends on your exact location, what you plan to use the building for, and how your local jurisdiction handles state building codes. Tennessee is one of the few states where counties can opt out of the state building code entirely, and permit requirements vary significantly across Middle Tennessee.
At PAC Building Pro in Waverly, we build custom post-frame pole barns across Humphreys, Dickson, Houston, Benton, Perry, Hickman, and the surrounding Middle Tennessee counties. We've worked with property owners in rural areas and inside town limits, and we've learned that every county—and sometimes every city—handles permits a little differently. Here's what you need to know before you build.
Why Do Permit Rules Vary So Much in Tennessee?
Tennessee allows local governments to do one of three things with state building codes: enforce them, become exempt from them, or withdraw from them entirely. Many rural counties have opted out of the state building code, which means they don't require building permits for any structure. Other counties and cities enforce the codes and require permits for most construction projects.
The result is a patchwork: in some unincorporated areas, you can build a pole barn with no permit at all. In others—especially inside city limits—you'll need a permit, inspections, and possibly engineered or PE-stamped drawings. That's why it's critical to check with your local building department before you pour the first pier.

What About Agricultural Exemptions?
Tennessee law provides an exemption for agricultural buildings—structures used directly for farming operations on bona fide working farms. If your pole barn will be used for hay storage, livestock, farm equipment, or other commercial agricultural production, it may be exempt from state building code requirements even in counties that otherwise enforce the code.
To qualify for an agricultural exemption, the property must be actively used for commercial farming. Some counties require documentation such as an IRS Schedule F (farm income statement) or an Agricultural Sales and Use Tax Exemption certificate. The rules for what counts as "agricultural" and what documentation is needed vary by county, so ask your local building department whether your project qualifies.
If your pole barn is for personal storage, a workshop, a hobby farm, or any non-commercial use, it typically won't qualify for the ag exemption.
Get a free, no-pressure quote at pacbuildingpro.com or call (931) 296-2777.
Do You Need Engineered or PE-Stamped Plans in Dickson County?
Whether you need engineered plans or engineer-stamped (PE-stamped) plans depends entirely on the local codes department for your county or city. Many rural Middle Tennessee counties—including Humphreys County, for example—do not require engineered or stamped plans for pole barns, especially agricultural buildings. Some cities and counties do require PE-stamped drawings for any permanent structure.
PAC Building Pro provides building drawings engineered for Middle Tennessee's design loads: 10 pounds per square foot ground snow load and 90 mph design wind speed (3-second gust). If your county or city requires PE-stamped plans, we can provide them on request—just know that adds cost and lead time to your project.
Bottom line: don't assume stamped plans are always required, and don't assume they're never required. Confirm with the Dickson County building department or your city codes office what they need for your specific site.
What If Your Property Is Inside City Limits?
If your property is inside the city limits of Dickson, White Bluff, Burns, Charlotte, or any other incorporated town in the county, the city typically has its own codes office and its own permit requirements. Cities are more likely to require building permits, inspections, and engineered or stamped plans than unincorporated county land.
You'll also need to check setback requirements—how far your pole barn must sit from property lines, roads, and other structures—and whether you need a separate zoning permit. Some cities have restrictions on building height, roof pitch, or exterior materials, especially in residential zones.
Always call the city codes office before you start. The county building department won't have jurisdiction inside city limits.
What Does the Permit Process Look Like When One Is Required?
When a building permit is required, the process generally looks like this:
- Submit an application to the county or city building department, usually with a site plan, building drawings, and a description of the intended use.
- Pay the permit fee, which varies by jurisdiction and is typically based on the building's square footage or estimated value.
- Schedule inspections at key stages: footing or foundation, framing, and final. The inspector verifies that the work meets code.
- Receive a certificate of occupancy or final approval once all inspections pass.
The building permit is the property owner's responsibility. At PAC, we provide the drawings and can answer questions about the process, but you'll need to apply for and manage the permit with your local office.
| Location Type | Permit Likelihood | What to Check |
|---|---|---|
| Unincorporated county (rural) | Varies—some counties require none | County building department |
| Inside city limits | Usually required | City codes office |
| Agricultural use (bona fide farm) | May be exempt | County or city, plus ag documentation |
| Near city limits (county land) | May need zoning permit | County zoning office |
What Are Common Pole Barn Sizes and Uses?
A 30×40 pole barn (1,200 square feet) is a popular size for two large vehicles, a workshop, or equipment storage. A 40×60 building (2,400 square feet) accommodates multiple vehicles, hay and livestock, or a combination of workshop and storage space. Larger builds—50×80 or bigger—are common for commercial farm operations or serious equipment storage.
The size and intended use of your pole barn can affect whether a permit is required and what documentation the county or city will ask for. A small agricultural equipment shed may be treated differently than a large shop or a building with living space.
What About Other Middle Tennessee Counties?
Permit requirements vary just as much in the counties surrounding Dickson. In Humphreys County (Waverly, New Johnsonville, McEwen, Hurricane Mills), no permit is required in the unincorporated county, but cities do require one. In Houston County (Erin, Tennessee Ridge), Benton County (Camden, Big Sandy), Perry County (Linden, Lobelville), and Hickman County (Centerville), the rules differ again.
We also build and deliver across a 70-mile radius—including Cheatham County (Ashland City, Kingston Springs), Robertson County (Springfield, Greenbrier), Montgomery County (Clarksville), and even out to Nashville, Columbia, and Jackson. No matter where your property is, the first step is always the same: call your local building department or city codes office and ask what's required for a pole barn at your address.
How Much Does It Cost to Build a Pole Barn in Dickson County?
Cost depends on the building's size, what you finish inside, how much site prep and grading are needed, the foundation type (concrete piers or treated posts), the number of doors and windows, whether you add insulation, and whether you need electrical or HVAC. A basic agricultural shell costs far less than a finished, insulated shop with overhead doors, man doors, windows, and power.
Whether your county requires PE-stamped plans, permits, and inspections can also affect your timeline and budget. The best way to get an accurate price for your project is to request a free quote with your specific size, features, and site conditions.
Frequently Asked Questions
Do I need a building permit for a pole barn in Dickson County?
It depends on whether your property is in the unincorporated county or inside city limits, and whether the building qualifies for an agricultural exemption. Contact the Dickson County building department or your city codes office to confirm the requirements for your site.
Are engineered or PE-stamped plans always required for a pole barn in Tennessee?
No. Requirements vary by county and city. Many rural Middle Tennessee counties do not require stamped plans, especially for agricultural buildings, while some jurisdictions do. PAC provides engineered drawings and can supply PE-stamped plans when your local codes office requires them.
Can I build a pole barn without a permit if it's for farm use?
Possibly, if your property qualifies for Tennessee's agricultural building exemption and your county enforces that exemption. You'll typically need to show that the land is actively used for commercial farming, and some counties require documentation like an IRS Schedule F. Always verify with your local building department first.
Does PAC Building Pro handle the building permit for me?
The building permit is the property owner's responsibility. We provide the engineered drawings and can answer questions about the process, but you'll need to apply for and manage the permit with your county or city codes office.
Ready to start your project? PAC Building Pro serves Dickson County, Humphreys County, and the surrounding Middle Tennessee area with custom pole barns built on your property. Get a free quote at pacbuildingpro.com or give us a call at (931) 296-2777. We'll help you figure out what you need—and what it'll take to get it built right.